---
title: "Reuse a document as a template"
description: "Prepare a new report with an earlier report’s sections and check that it uses current data."
language: en
updated: 2026-11-21
url: https://faena.team/en/docs/reuse-document
---

# Reuse a document as a template

Prepare a new report with an earlier report’s sections and check that it uses current data.

You’ll have a new report for Carmen using the sections from an earlier report for Elena. The Employee replaces the project details and calculates the remaining budget for you to review.

You need an Employee who prepares reports. [Choose or add one](https://faena.team/en/docs/choose-employee) and note their name.

## Prepare the sample report

Download [North Project Report 2025 (PDF)](https://faena.team/docs-assets/north-project-report-2025-en.pdf). This sample report for Elena has Summary, Milestones and Budget sections, September 2025 dates and a €6,000 budget, with €3,500 spent.

1. [Upload the PDF to a company folder](https://faena.team/en/docs/learn-from-folder#upload-the-document-to-a-company-folder).
2. Open the file and check that you can read its pages and figures.

For real work, use a report you have permission to share.

## Request the new report

Open [**Ask for something**](https://app.faena.team/inicio) and send this request with the details below:

> Have [Employee’s name] prepare “South Project Report 2026” as a PDF, using the sections and style of “North Project Report 2025”. Replace the details with the ones I give you and calculate the remaining budget, keeping the original file. Leave the launch date pending and ask me for missing information.
>
> South Project 2026. Client: Carmen. Start: 4 October 2026. Completed: homepage approved and product-page layout finished. Next milestone: product-page draft, 7 October 2026. Approved budget: €2,400. Spent: €900. Launch: not agreed.

Your assistant gives the job to that Employee. Ask it if you want to know the cost first.

## Check the facts and layout

Open the PDF in [**Results**](https://app.faena.team/resultados) and compare it with Elena’s report. Check that the Employee keeps the sections and uses these details:

- Carmen and South Project 2026, starting on 4 October.
- A €2,400 budget, €900 spent and €1,500 remaining.
- 7 October as the product-page draft date, with the launch awaiting confirmation.

Search the whole document, including footers and appendices, for “North”, “Elena”, “2025”, “€6,000” and “€3,500” to spot old details. Check that you still have the original file too.

Also review any questions the Employee left for you and the PDF’s appearance.

## Request a correction

Reply in the same conversation with the detail and the change: “In Budget, you’ve kept the €6,000 from Elena’s project. Carmen’s budget is €2,400.” Open the corrected PDF and check the amounts.

To teach guidance for other reports, write to the Employee in their conversation and say that the instruction is for future reports. For example: “When a figure is missing, leave the cell pending and ask me.”

To prepare the report every month with new data, follow [Repeat a job with fixed steps](https://faena.team/en/docs/recurring-job).

## If something is different

- If the Employee proposes another file format, check that it works for you before accepting.
- The layout may differ from the original. Name the page or element you want corrected and review the new version.
- For help with an unreadable file, follow [Give access to a document folder](https://faena.team/en/docs/learn-from-folder).

## Related guides

- [Give access to a document folder](https://faena.team/en/docs/learn-from-folder.md)
- [Teach with examples and corrections](https://faena.team/en/docs/learn-from-corrections.md)
- [Find and review your team’s work](https://faena.team/en/docs/results.md)
